MOLDITQUICK

SERVICES

Mold Making Service

The mold determines the cost, quality and lifespan of every molded part. We design and build injection molds in our own tool shop — rapid tooling to validate your design quickly, and hardened production tooling engineered for high-volume programs.

WHAT WE OFFER

What We Offer

By Molding Process

Tooling designed around the molding process your part needs.

  • Standard two-plate molds
  • Three-plate molds
  • Two-shot / multi-shot molds
  • Insert & overmold tooling

By Production Volume

Rapid tooling for validation, production tooling for long runs.

  • Rapid tooling — weeks, not months
  • Bridge tooling for early production
  • Hardened production tooling
  • Multi-cavity & family molds

By Precision

Precision molds for tight-tolerance and cosmetic-grade parts.

  • Precision mold making
  • Tight tolerance control
  • Textured / cosmetic surfaces
  • Hot runner systems

HOW IT WORKS

From Inquiry to Delivery

1

DFM & Mold Design

Part geometry review, gate and runner layout, cooling-circuit design and mold-flow analysis before any steel is cut. DFM is the cheapest revision you will ever make.

2

Materials Preparation

Mold steel ordered and verified per program class — P20/718 pre-hardened for standard production, H13 or S7 for high-pressure or die-casting work.

3

CNC Machining

3-axis and 5-axis CNC milling of cores, cavities and inserts in our tool shop; 5-axis cuts deep, angled features that 3-axis would need multiple setups for.

4

Sinker EDM Machining

Sinker EDM burns sharp internal corners, square pockets and deep ribs that no cutter can reach; electrodes are machined in-house for tight control.

5

Wire-Cut EDM

Wire EDM cuts through-hardened inserts, core pins and ejector profiles — 9+4 wire-cut machines on our floor.

6

Assembly & Fitting

Mold-base assembly, core fitting, clearance and alignment checks — the stage where fit-up errors show up before any plastic is shot.

7

Polishing & Surface Finish

Cavity polishing to SPI grades A1–D3 and texturing or etching for cosmetic surfaces, finished to your surface spec.

8

Trial & Approval

Trial shots on our Sodick presses, dimensional verification and approval samples before the mold is released to production.

CHALLENGES

Challenges This Service Solves

Molding defects

Too many defects — burn marks, flow lines, sink marks, short shots, flash — during the whole mold life.

Hidden cost

Long injection cycles, rework and untimely communication quietly inflate the program cost.

Repeated trials

The mold is repaired again and again because of design or process problems, delaying the schedule.

Late delivery

Delivery pushed back several times with endless excuses.

FAQ

Mold Making Service — FAQ

Which mold types do you build?

Injection molds — two-plate, three-plate, hot-runner, two-shot and insert tooling — plus die-casting molds; stamping, forging, extrusion and blow molds are outside our tool-shop scope.

How long does mold making take?

Simple small molds 1–2 weeks, medium complexity 2–4 weeks, complex and large molds 8+ weeks; rapid tooling can ship in as little as 7 days.

Which steel gives the best value?

P20 for medium and small molds with general precision; 718 when toughness, hardenability and size push requirements up; H13 for die-casting work.

What tolerance can precision molds hold?

Medical-grade programs are controlled to ±0.005 mm or tighter under ISO 13485; aerospace-class molds are held at micron level.

Do you maintain the mold after delivery?

Yes — maintenance and care guidance is included with every mold; for programs molded with us the tooling stays on file, reorder-ready.

RELATED SEARCHES

What Buyers Search

* Keywords from Semrush competitor data — one page per search intent.

Mold Types We Build, by Process and Volume

Classification follows https://firstmold.com/mold-making-service/ (by molding process, production volume and precision).

Two-plate injection molds — the workhorse; simple parting, low cost, fast cyclesThree-plate injection molds — separate runner plate for multi-drop gatingHot-runner molds — no cold-runner scrap; critical for engineering resinsTwo-shot / multi-shot molds — two materials in one cycleInsert & overmold tooling — metal inserts or TPE over a molded substrateRapid (aluminum) tooling — 100–10,000 cycles for validation and bridge runsHardened production tooling — 100k–1M+ cycles for mass productionDie-casting molds — H13-based tooling for aluminum and zinc parts

Mold Steel Selection Guide

Hardness values are public supplier data; P20/718/H13 guidance per the FAQ at https://firstmold.com/mold-making-service/. MOLDITQUICK keeps all listed grades in stock for in-house tooling.

SteelHardness (HRC)StrengthsBest ForTypical Life
P2028–32Pre-hardened, easy machining and polishing, low costMedium and small molds, general-precision parts200k–500k shots
718 (1.2738)28–33Nickel-added — better toughness and hardenabilityLarge, complex, precise injection molds500k–1M shots
NAK8038–42Mirror-polish capability, no heat-treatment distortionCosmetic, optical and high-gloss surfaces500k+ shots
S136 (1.2083)48–52Corrosion-resistant, high hardnessMedical, food-contact and transparent parts1M+ shots
H1344–52Hot-work toughness, thermal-fatigue resistanceDie-casting molds and high-temperature plastics500k–1M shots
S756–60Impact- and shock-resistantHigh-pressure thin-wall and abrasive resins1M+ shots

SPI Mold Classification — Class 101 to 105

SPI / Plastics Industry Association class system; firstmold.com/mold-making-service/ states strict adherence to SPI mold classification standards.

ClassCycle LifeMold SteelTypical Program
1011,000,000+Hardened tool steel (H13, S7)High-volume automotive and medical; 5+ year life
102500,000–1,000,000Hardened steelLong-running appliance and power-tool programs
103300,000–500,000P20 / 718 pre-hardenedStandard consumer-goods production
104~100,000P20 or aluminumBridge tooling, pilot programs, spares
105< 500Aluminum / soft toolingPrototype validation and design iteration

Mold Lead Time and Cost: What the Numbers Really Are

Cycle and cost-share figures are public values from the FAQ at https://firstmold.com/mold-making-service/; MOLDITQUICK program lead times are our own standard commitments.

Simple / small mold1–2 weeks from approved DFM
Medium-complexity mold2–4 weeks
Complex or large mold8+ weeks (large tools can run 3+ months)
Rapid toolingFrom 7 days on urgent programs
Mold steel share of total cost≈20–30% (simple molds near 20%, complex molds above 30%)
MOLDITQUICK low-volume programFirst molded parts in 7–12 days
MOLDITQUICK mass-production programTooling plus first production in 25–30 days
Quality systemIATF 16949, ISO 13485 and ISO 9001 controlled tool shop